Locked out until spring
A RIVERLAND lock was drained of almost 8 million litres of water in late April to undergo essential works for the first time in almost two decades, with the 100-year old piece of infrastructure now set to reopen in October.
A RIVERLAND lock was drained of almost 8 million litres of water in late April to undergo essential works for the first time in almost two decades, with the 100-year old piece of infrastructure now set to reopen in October.